Cobb Parkway at I-285 Westbound Ramp and Spring Road/Circle 75 Parkway

Operational improvements included widening the existing dual left turn lanes from northbound Cobb Parkway to westbound Spring Road to create triple left turn lanes. The turn lanes on the I-285 westbound ramp were lengthened, and an additional barrier separated turn lane from the I-285 westbound off-ramp to Circle 75 Parkway was added. The project also included construction of 8-foot to 12-foot-wide sidewalks. Construction began in April 2016 and was substantially completed in March 2017.