Project Description: This project includes replacing the bridge over the Chattahoochee River located in Cobb and Fulton Counties, Georgia. To accelerate construction of the new bridge, this project has been split into two phases:

Phase 1: From Northgate Drive to Paces Mill Road. This phase will include reconstruction and widening of the bridge over the Chattahoochee River. The length of this proposed phase is 0.53 miles.

Phase 2: Paces Mill Road to Akers Mill Road.  This phase will widen the existing roadway from 5-lanes to 6-lanes with new sidewalks, multiuse trail and new traffic signals.

Project Schedule: Phase 1 construction was started December 18, 2011 and is scheduled to be completed by December 31, 2014.  Phase 2 construction was started August 2, 2013 and is scheduled to be completed by June 20, 2016.

Project Manager Information: For more information, please contact Cobb DOT Engineering at 770-528-1621.

Project Downloads: 

Click here to view Phase 1 PDF alt

Click here to view Phase 2 PDF alt

Click here for GDOT Project Handout alt