Skip Spann Connector

alt

The Skip Spann Connector—Cobb County’s first lighted bridge—is a 416-foot-long link between Frey Road and Busbee Drive over I-75, which gives commuters improved highway access to Town Center commercial amenities and Kennesaw State University (KSU). A near 20 percent reduction in daily traffic along Chastain Road at the I-75 interchange is expected as a result of the new bridge. Pedestrians and bicyclists now also have improved access between the KSU campus and the university's stadium.

Construction on the Skip Spann Connector began in April 2014, and a ribbon-cutting for the opening of the bridge took place in May 2016. The iconic design mimicking the shape of the Kennesaw Mountains was created by a team of students from Southern Polytechnic State University, Kennesaw State University, and Chattahoochee Technical College. The project—named for the late Thomas E. Skip Spann, founding member of the Town Center Community Improvement District—also included the creation of four lanes of new connecting roadway, 11.5-foot-wide sidewalks, bike lanes, benches, planters and pedestrian lights as well as the realignment of TownPark Lane and the addition of a roundabout at the intersection of TownPark Lane and Busbee Drive.

 

 
Downloadable Files
Overview of project area Project map
Overview of project area alt Project map alt
Roundabout project detail drawing Image of Skip Spann Connector Bridge at night.
Roundabout project detail alt Bridge at Night alt
Bridge design concept drawing Bridge detail
Bridge design concept alt Bridge detail alt

 

 
Handouts
Project fact sheet graphic Facts about Roundabouts handout image
KSU Parking Info alt Cobb DOT roundabout factsheet alt

Find out more about roundabouts.

 

 
Project Manager and other Information

For information about this project, please contact Project Manager James Hudgins at James.Hudgins@CobbCounty.orgor 770-420-6658.

A public meeting packet was distributed at the April 16, 2013 public meeting.